02 9482 4461 - Contact Us
The roof sheets were in excess of 15 metres so a decision was made to roll form the sheets at roof level, which posed a challenge due to the high wings on the 9th floor.
A larger thasn normal team was motivated to complete the roll forming process in 1 day with installation following the next.
For the interior zinc to the fins, we provided the steel structure, and also clad the fins off site in Sydney, transporting them to site and then lifting them into position & fixed off into the concrete slab.