02 9482 4461 - Contact Us
The office foyer renovation included a feature that would be fixed over the lift doors and act as a way of delivering air conditioning to the entry space.
Shop drawings were finalise, and the steel structure installed to the existing walls, and the carpentry work consisted of installing a MDF panel system fixed with a split batten.
The panels were then removed, clad in 600metres of Brass extrusions and re-installed.
The top of the feature included a recess shadow gap that allowed air conditioning to fill the entry areas.
Brass skirting the the foyer as well as brass panelling to the walls completed the fit out.